RA Dalton Success Stories

RA Dalton Ltd are the Klargester number one accredited installer covering the whole of the UK.

Contact Us Today

When the job gets a little ‘Rocky’ – send in the Breaker!

When working in certain areas in the country or even in the landscape it is always important to understand the possibility of hitting different ground conditions. For one property based in a very picturesque are of County Durham our installation team was assigned a job to install a new Premier Tech Aqua ASP8 package sewage treatment plant. 

The 5 bedroom property was set on the border of the River tees and the mature, landscaped garden was were the existing septic tank was located. Unfortunately, this septic tank was not compliant with the new 2020 General Binding Rules, we therefore recommended to install the new sewage treatment plant and modify the existing inlet and outlet drainage.

Breaking ground on the riverbed. 

Due to the close proximity of the riverbed to the new installation location we knew there was a good chance we would come across rocks, with this in mind we provided our installation team with a 5 ton Excavator and breaker. 

However, even with the breaker the going was slow! When contending with boulders and riverbed conditions it was steady away and large rocks meant our excavation was a considerable amount larger than was desirable.

Taking this into account more concrete was required to fill the voids around the tank to full encase it and protect against potential ground water issues.

The Premier Tech ASP8.

Once the premier tech ASP8 was installed in a full concrete surround the next port of call was to install the drainage, this was just as complicated with as the tank installation – a lot of the drainage required a smaller machine to access. The best course of drainage included going through a tree line and under an archway to the riverbed.

Once the new tank and drainage was installed the old was disconnected and the existing septic tank was decommissioned, we left site with the property now compliant with the General binding rules.

Supporting the next stage of our growth

RA Dalton servicing van in a field

As RA Dalton continues to grow, we’re looking at how we can develop the way we work to support both our customers and the wider business.  

With new opportunities emerging and our customer base continuing to develop, it is vital our internal processes and communication evolve alongside us. This means strengthening how different departments connect and ensuring that we continue to provide the consistent, quality, personable service our customers expect.  

As part of this ongoing development, we are pleased to share that Gail Bould will be moving into a broader role within the company as Business Development Operations Manager. 
Gail Bould standing in front of the RA Dalton Logo
“I would like to express how proud I am to be given the opportunity, and I am looking forward to working closely with all departments in achieving our ambitions for growth across the organisation. Whilst ensuring the highest standards of customer engagement and satisfaction.”

Looking Ahead

As we look towards the future, it’s an exciting time for RA Dalton. Growth isn’t simply about bringing in new business; it is also about building on what we already do well and finding ways to work better together.
Congratulations on your new role Gail, we wish you every success as you take on this next chapter!
Gail sitting at her desk

Durham Office

01388 537030

Burtreeford
Bishop Auckland
County Durham
DL13 1DB

Crook Office

01388 537030

Unit 10c,
Beechburn Industrial Estate,
Crook,
County Durham, DL15 8RA

Glasgow Office

01698 827628

Room 1.6,
CoVault,
1 Redwood Crescent
East Kilbride
G74 5PA

Chesterfield Office

01246 865412

Unit 2, Midway Business Centre
Bridge Street Industrial Estate
Clay Cross, Chesterfield
S45 9NU

Cornwall Office

01326 653222

PFS Ltd, Suite 9,
The Camborne Business Centre,
Weeth Lane, Camborne,
TR14 7DB

West Yorkshire Office

Unit 1D
Canteen Mill Industrial Estate
Burnley Road
Todmorden
OL14 7DR

We cover the following areas