Venture into the wet and wild west with a Clenviro CLF3

This time of year often causes complications with wild weather conditions, so far in this brief winter we have encountered rainfall to challenge a monsoon, icy conditions that would make even penguins shiver and even the dreaded white stuff making an appearance!

To combat this, you must always be equipped for the worst and in certain areas this is more likely to cause issues.  To be prepared is the best road to success and allows our installation teams to overcome any challenges they encounter, and for one of our recent installations it certainly aimed to keep us on our toes!

Shoring and high-water table.

November is often one of our more turbulent months for weather conditions and this year did not disappoint! One of our teams started an installation of a new Clenviro CLF3 Matrix package sewage treatment plant in Lancashire and when we say the heavens opened they certainly poured leaving our excavations full to the brim with water.

To add complication the ground conditions were less than favourable, and it was soon determined that to stabilise the excavation we have to use a temporary steel ground stabilisation to ensure the ground does not cave in and also to protect our team – health and safety is always of utmost importance.

Installation of the new sewage treatment plant.

Not to shy away from the task at hand we soon arranged for the relevant equipment and machinery to be delivered to site, a submersible pump was then used to lower the water table enough to allow the new tank to be installed in a dry concrete surround.

It was more vital than ever to ensure that the right concrete mix was used as if the water content was too high in the aggregates and combined with the already present water it would have been near enough impossible to keep the new unit installed with the water pressure pushing the system out of the ground.

The Clenviro CLF3 Matrix IPS package sewage treatment plant.

During the initial quotation phase of the project our contracts manager Andrew Hill proposed to install a Clenviro CLF3 matrix package sewage treatment plant to suit the application, this system was sized to suit the cottages and is the equivalent of an 18-population unit. This is system is also one of the favourites for our installation teams to install, the cylindrical shape makes for an easier installation and certainly helped when battling against the ground conditions.

This system was also installed to replace a failed septic tank and soakaway, it was no real surprise as to why the soakaway had failed! The installation of a new sewage treatment plant bypassed the requirement for a new drainage field to be installed as the percolation tests would have never passed Building control standards. We therefore decided to quote to install a new sewage treatment plant with a discharge to the watercourse.

For more information on the systems we can install why not give us a call on 01388 537030.

Supporting the next stage of our growth

RA Dalton servicing van in a field

As RA Dalton continues to grow, we’re looking at how we can develop the way we work to support both our customers and the wider business.  

With new opportunities emerging and our customer base continuing to develop, it is vital our internal processes and communication evolve alongside us. This means strengthening how different departments connect and ensuring that we continue to provide the consistent, quality, personable service our customers expect.  

As part of this ongoing development, we are pleased to share that Gail Bould will be moving into a broader role within the company as Business Development Operations Manager. 
Gail Bould standing in front of the RA Dalton Logo
“I would like to express how proud I am to be given the opportunity, and I am looking forward to working closely with all departments in achieving our ambitions for growth across the organisation. Whilst ensuring the highest standards of customer engagement and satisfaction.”

Looking Ahead

As we look towards the future, it’s an exciting time for RA Dalton. Growth isn’t simply about bringing in new business; it is also about building on what we already do well and finding ways to work better together.
Congratulations on your new role Gail, we wish you every success as you take on this next chapter!
Gail sitting at her desk

Durham Office

01388 537030

Burtreeford
Bishop Auckland
County Durham
DL13 1DB

Crook Office

01388 537030

Unit 10c,
Beechburn Industrial Estate,
Crook,
County Durham, DL15 8RA

Glasgow Office

01698 827628

Room 1.6,
CoVault,
1 Redwood Crescent
East Kilbride
G74 5PA

Chesterfield Office

01246 865412

Unit 2, Midway Business Centre
Bridge Street Industrial Estate
Clay Cross, Chesterfield
S45 9NU

Cornwall Office

01326 653222

PFS Ltd, Suite 9,
The Camborne Business Centre,
Weeth Lane, Camborne,
TR14 7DB

West Yorkshire Office

Unit 1D
Canteen Mill Industrial Estate
Burnley Road
Todmorden
OL14 7DR

We cover the following areas