Solving Spring Water Supply Issues: HDPE Vessel Installation

Project Overview & Site Background

RA Dalton was appointed to complete a local wastewater installation, tackling a critical issue: the property’s original spring had almost dried up, leaving water supply unreliable during dry spells. Our solution involved installing a 3000L below-ground HDPE vessel and creating a sustainable system to ensure consistent water flow.

The property relied on a natural spring system that had deteriorated over time. During site inspections, RA Dalton discovered a secondary spring and an unused MDPE pipe, which influenced our design for a future-proof water management system.

Our Proposal

To restore reliability, RA Dalton designed a system that combined storage, filtration and maintenance access:

  • 3000L HDPE storage vessel installed in the upper grass field.
  • Concrete settlement chamber to manage silt and improve water quality.
  • Discharge system using 50mm MDPE pipework to reconnect to the property.
  • Overflow pipeline terminating in a nearby ditch for safe water management.

This approach ensured efficient filtration, long-term durability and easy maintenance.

Works Carried Out

Once the design was agreed, RA Dalton mobilised to site and implemented a structured approach to ensure the installation was completed safely and efficiently. The first step involved preparing the site with temporary fencing and welfare facilities, creating a secure working environment for our team and protecting the surrounding property.

Excavation works were carried out to install the HDPE storage vessel and the concrete settlement chamber, both positioned to optimise water collection and filtration. These components were installed in strict accordance with manufacturer guidelines to guarantee durability and compliance with industry standards. The settlement chamber was a critical element of the design, as it allows silt and debris to settle before water enters the main storage vessel, reducing the risk of blockages and improving water quality.

To connect the springs and integrate the new system, we laid approximately 140 metres of drainage pipework, carefully encased in granular material where required to provide stability and protect against ground movement. This network ensures that water from multiple sources flows efficiently into the storage vessel, maintaining a consistent supply even during dry periods.

Added Value

Additional works included clearing existing land drains and restoring the site by levelling and tidying the wooded area, leaving the property not only functional but visually improved. We also ensured system checks were conducted to guarantee optimal performance and long-term durability.

Every stage of the project was completed with precision, ensuring the system is robust, easy to maintain and capable of delivering reliable water supply for years to come.

Why Choose RA Dalton?

This project demonstrates RA Dalton’s expertise in wastewater solutions, spring water management and HDPE vessel installations. It also highlights how we deliver reliable, cost-effective systems tailored to each client’s needs.

Do you need a dependable wastewater solution? Contact RA Dalton today for expert installation services that guarantee reliability and compliance.

Durham Office

01388 537030

Burtreeford
Bishop Auckland
County Durham
DL13 1DB

Crook Office

01388 537030

Unit 10c,
Beechburn Industrial Estate,
Crook,
County Durham, DL15 8RA

Glasgow Office

01698 827628

Room 1.6,
CoVault,
1 Redwood Crescent
East Kilbride
G74 5PA

Chesterfield Office

01246 865412

Unit 2, Midway Business Centre
Bridge Street Industrial Estate
Clay Cross, Chesterfield
S45 9NU

Cornwall Office

01326 653222

PFS (Helston) Ltd,
Water-Ma-Trout,
Helston,
Cornwall,
TR13 0LW

West Yorkshire Office

Unit 1D
Canteen Mill Industrial Estate
Burnley Road
Todmorden
OL14 7DR

We cover the following areas