RA Dalton Success Stories

RA Dalton Ltd are the Klargester number one accredited installer covering the whole of the UK.

Contact Us Today

From Septic to Superior: A Clearwater BioAir CW3 Upgrade for a Six-Bed Family Home

Site Details

When a property owner contacted RA Dalton Ltd about replacing an old septic tank with a modern sewage treatment plant, we knew this project would require precision planning and expert execution. The property, set to become a spacious six-bedroom home with multiple bathrooms and utility areas, needed a future-proof wastewater solution that met environmental standards and delivered reliable performance.

Project Overview

Location: Private residential property with full land ownership.

Challenge: Replace an outdated septic tank with a compliant sewage treatment system capable of handling increased capacity.

Timeline: Works scheduled once the property was vacated.

The existing system was no longer suitable for the planned expansion and the client required a Clearwater BioAir CW3 IPS packaged sewage treatment plant to ensure efficient and environmentally friendly wastewater treatment.

Site Audit & Planning

Our initial site visit confirmed the need to:

  • Empty and decommission the old septic tank and infill with gravel.
  • Install the new treatment plant at a location slightly further from the property for optimal performance.
  • Connect the treated effluent back to the existing storm outfall pipe via a new inspection/sample chamber, ensuring compliance with discharge regulations.

Ground Conditions

Local borehole data indicated sandy clay with thin sand layers, which informed our excavation strategy and contingency planning for potential unstable ground or hard rock.

Works Carried Out

To deliver a compliant and efficient wastewater solution, our team began by preparing a detailed Risk Assessment and Method Statement. This ensured that every stage of the installation was carried out safely and in line with industry standards.

We then set up the site and coordinated the delivery of all materials and machinery. This preparation was crucial for maintaining a smooth workflow and minimizing disruption to the property.

The core of the project involved installing a Clearwater BioAir CW3 IPS packaged sewage treatment plant within a full concrete surround. This approach guarantees structural stability and long-term durability, especially in areas with variable ground conditions. The system was fitted with a control panel and high-level alarm, providing the homeowner with peace of mind and easy monitoring of the plant’s performance.

To ensure proper discharge of treated effluent, we excavated and located the existing storm outfall pipe and installed a new inspection and sample chamber. This step is essential for compliance with environmental regulations, allowing for easy sampling and monitoring of water quality.

We also installed an inlet inspection chamber, two sections of 110mm inlet drainage, and a sample point to facilitate maintenance and inspection. Additionally, we laid 2 metres of 50mm black MDPE outlet pressure pipe to connect the system securely.

Finally, we emptied and decommissioned the old septic tank, filling it with five tonnes of gravel and overlaying it with excavated soil. This process prevents future ground instability and ensures the site remains safe and tidy.

The Outcome

The property now benefits from a modern, efficient sewage treatment system that meets all regulatory requirements and supports the planned expansion. By installing the Clearwater BioAir CW3, we ensured:

  • Improved environmental compliance
  • Reliable wastewater treatment
  • Future-proof capacity for a large household

Why Choose RA Dalton Ltd?

With decades of experience in wastewater solutions, we provide expert advice, professional installation and ongoing support for domestic and commercial sewage treatment systems. Whether you need a septic tank replacement or a new sewage treatment plant, our team delivers quality and peace of mind.

Durham Office

01388 537030

Burtreeford
Bishop Auckland
County Durham
DL13 1DB

Crook Office

01388 537030

Unit 10c,
Beechburn Industrial Estate,
Crook,
County Durham, DL15 8RA

Glasgow Office

01698 827628

Room 1.6,
CoVault,
1 Redwood Crescent
East Kilbride
G74 5PA

Chesterfield Office

01246 865412

Unit 2, Midway Business Centre
Bridge Street Industrial Estate
Clay Cross, Chesterfield
S45 9NU

Cornwall Office

01326 653222

PFS (Helston) Ltd,
Water-Ma-Trout,
Helston,
Cornwall,
TR13 0LW

West Yorkshire Office

Unit 1D
Canteen Mill Industrial Estate
Burnley Road
Todmorden
OL14 7DR

We cover the following areas