RA Dalton Success Stories
RA Dalton Ltd are the Klargester number one accredited installer covering the whole of the UK.
Klargester Twin Stage 3,500 Litre Gamma Septic Tank Installation
RA Dalton Ltd was appointed to replace a failing and non-compliant septic tank serving a five-bedroom domestic property. The project required the installation of a Klargester Twin Stage 3,500 litre Gamma Septic Tank and the construction of a new drainage field to ensure compliance with current environmental regulations.
Uncovering Hidden Challenges During Site Investigation
Our initial site visit revealed several complexities. We inspected the existing drainage system and checked for rainwater connections, but found no chambers on the inlet drainage, limiting access for a full survey. At the tank, we discovered two inlets and a blocked outlet, which raised concerns about potential flow restrictions.
A dye test was performed on a pipe running from the barns to the tank and rainwater pipes around the property appeared disconnected, with open downpipe outlets discharging onto the ground. A deep soakaway adjacent to the soil pipe was identified, but it seemed to run beneath the property without any visible chamber.
Due to these limitations, a CCTV survey was not possible. Instead, we recommended a full survey of the inlet drainage and percolation testing before installation to ensure the new system would function effectively.
Key Obstacles and How We Overcame Them
The site presented several challenges:
- Livestock presence in the field posed contamination risks and required additional safety measures.
- The lack of manhole access restricted visual inspection, making accurate planning more complex.
- The existing tank was deemed unsafe, increasing the need for careful decommissioning.
Despite these obstacles, we were able to proceed with confidence and design a compliant solution.
Our Comprehensive Approach to Septic Tank Installation
To deliver a fully compliant and efficient wastewater solution, RA Dalton Ltd implemented a structured plan. The first step was conducting percolation tests to determine the correct size of the new drainage field, ensuring optimal soakaway performance. Based on these results, we prepared a detailed Risk Assessment and Method Statement to guarantee safe and controlled execution.
Once the site was prepared, we supplied and installed a Klargester Twin Stage 3,500 litre Gamma Septic Tank within a full concrete surround, providing long-term durability and compliance with regulations. To facilitate future maintenance, we installed shallow inlet and outlet inspection chambers.
The new drainage system included approximately 10 metres of 110mm inlet drainage and a 99-metre drainage field, constructed using slotted pipe bedded in clean washed gravel, overlaid with a permeable membrane and finished with excavated soil in a 900mm-wide trench. This design ensures efficient wastewater dispersal and prevents groundwater contamination.
Finally, the existing tank was emptied and decommissioned by filling with gravel and covering with soil. Surplus excavated material was removed using grab wagons, leaving the site clean and safe.
Understanding Soil Conditions for Optimal Performance
Percolation tests revealed ground conditions consisting of gravel over sandy clay, which influenced the design and size of the drainage field. This step was critical to ensure the system operates efficiently and complies with environmental standards.
Delivering Compliance, Efficiency and Peace of Mind
The project was completed successfully, providing a fully compliant wastewater solution tailored to the property’s needs. The new system ensures safe, efficient operation and meets all current environmental regulations. The old tank was responsibly decommissioned and the site was restored to a neat and functional condition.
Frequently Asked Questions (FAQs)
- What is a Klargester Twin Stage Septic Tank?
A Klargester Twin Stage Septic Tank is a high-performance system designed to treat domestic wastewater efficiently. It uses a two-stage process to separate solids and allow effluent to disperse safely into a drainage field. - Why are percolation tests important?
Percolation tests measure how quickly water drains through soil. This determines the size and design of the drainage field, ensuring the system works effectively and avoids environmental issues. - How do you decommission an old septic tank safely?
Decommissioning involves emptying the tank, filling it with gravel to prevent collapse, and covering it with soil. This process ensures the old tank poses no future risk to the property or environment.
Looking for a Compliant Wastewater Solution?
RA Dalton Ltd are experts in septic tank installation, drainage field construction, and wastewater compliance. Contact us today for professional advice and a tailored solution for your property.
Call us now or visit www.radalton.co.uk.
RA Dalton Opens New Rookhope Office

County Durham wastewater specialist RA Dalton has relocated members of its finance and accounts team to a new office at Unit 1, Rookhope Business Centre.
The move sees Accounts Manager Katie Jackson and her colleagues take up residence in the dedicated office space as the family-run company continues to expand its workforce and nationwide operations.
The Rookhope premises provide valuable additional space for the growing department while keeping the team in the heart of Weardale, close to RA Dalton’s Cowshill head office.
From a local family business to a national employer
Founded in 2003, RA Dalton has grown from a small local family business into a nationwide employer with more than 100 staff across the UK.
The company supplies, installs, services and maintains sewage treatment plants, septic tanks, pump stations and other off-mains drainage systems, working with homeowners, businesses, developers and organisations throughout the UK; providing support at every stage of the wastewater process.
Supporting a growing nationwide business
RA Dalton’s finance and accounts team play a vital role in supporting the company’s day-to-day activities across the UK. As the company has grown, so too has the volume and complexity of the work carried out behind the scenes.
The new office creates a dedicated working environment for the team. Colleagues can collaborate closely and continue to deliver an efficient service to customers, suppliers and other departments across the business.
The finance department continues to grow from strength to strength. RA Dalton recently recruited a new Accounts Receivable Coordinator, who joins the team at its new Rookhope base. This latest appointment is another key part of the company’s wider strategy to strengthen its internal operations and ensure it has the people and systems that support continued development.
Continued investment in Weardale
While RA Dalton now works with domestic and commercial customers across the UK, the company has retained strong links to Weardale. The decision to establish the finance team in Rookhope allows the business to create additional space without moving this important function away from the local area.
The new office demonstrates RA Dalton’s continued commitment to County Durham and the rural communities surrounding its original Cowshill headquarters, while bringing new professional employment opportunities to rural County Durham. This will help people build their careers without needing to travel to one of the region’s larger towns or cities.
RA Dalton has continued to invest in its people, premises, equipment and services as demand has increased. The new Rookhope office is the latest stage in that growth: providing Katie and the wider team space to support the business as it moves forward.
The finance team’s new address is Unit 1, Rookhope Business Centre, Rookhope, Bishop Auckland, County Durham, DL13 2DA.