RA Dalton Success Stories

RA Dalton Ltd are the Klargester number one accredited installer covering the whole of the UK.

Contact Us Today

One to tick off the list!

Panic.

It can affect us all during different periods of our lives, the majority of us have lived through the stress of a house move and having just experienced this myself I can only imagine the amplification of this feeling when you are completely renovating your home from scratch.

With so much to think about it is not surprising that some things can be left by the wayside – and one main thing to consider is the drainage and wastewater situation on site. If you have a property with off mains drainage this is something that should ideally be looked at prior to your purchase of the property; it is your solicitor’s responsibility to ensure that the tank is compliant before any money is exchanged.

However not all properties will have a fully functioning system before you move in and we have in the past come across situations where agreements have been made between both parties about the works required. But when you’re moving house this is likely to be the last thing you want on your plate.

But this is where we are here to help!

Kingspan Klargester BioTec 2 IPS

A little peace of mind never goes amiss in stressful situations and that is one thing that we can assure you – we always endeavour to adhere to all requests made by yourselves, going the extra mile to make sure you are happy at the end of the day. If you accept one of our quotations you can guarantee that you will have a little more time to have a cuppa tea and relax knowing that you are in knowledgeable hands.

Recently we had an enquiry from a couple who were going through such a stress, their home was being completely renovated which required them to move into a static caravan on their land whilst all of the works were being done. One of the factors of the makeover was to bring the drainage up to specification and to obey the new general binding rules that will be in place as of 2020.

The existing Septic tank on the property was sadly no longer compliant due to the discharge location, we therefore recommended that the site was brought up to spec by installing a Klargester BioTec 2 IPS package sewage treatment plant to serve the farmhouse and static caravan; due to the location of the caravan there was also a requirement for a single raw sewage pumping station to be installed to pump the effluent to the new treatment system.

The route for the drainage was to go through a small wooded area on the property boundary before discharging through a seasonal soakaway into a nearby ditch as the water levels in the stream are not guaranteed.

If you are concerned that these new regulations may affect you or even if you’re just looking for a new system to be installed why not give us a call

Durham Office

01388 537030

Burtreeford
Bishop Auckland
County Durham
DL13 1DB

Crook Office

01388 537030

Unit 10c,
Beechburn Industrial Estate,
Crook,
County Durham, DL15 8RA

Glasgow Office

01698 827628

Office 60
East Kilbride Business Centre
14 Stroud Rd
East Kilbride
G75 0YA

Chesterfield Office

01246 865412

Unit 2, Midway Business Centre
Bridge Street Industrial Estate
Clay Cross, Chesterfield
S45 9NU

We cover the following areas