Efficient Wastewater Upgrade: Klargester BioAir 2 Installed with Full Compliance
RA Dalton was approached by a client during the early stages of purchasing a new property. The homeowner required expert guidance regarding an existing septic tank and sought a compliant, long-term solution for wastewater management. Following a detailed site inspection, our team recommended the installation of a modern sewage treatment system to replace the outdated infrastructure.
Site Assessment and System Recommendation
Our initial assessment revealed that the existing septic tank and soakaway system serving the three-bedroom property were no longer suitable. We proposed the installation of a Klargester BioAir 2 packaged sewage treatment plant, selected for its low noise output and energy efficiency. The new system would be positioned in front of the old tank, with a drainage field located in the rear garden.
Navigating Site Access and Constraints
Site access presented several challenges, inclusive of a section of dry stone wall which required temporary removal to allow machinery access. Additionally, the team had to work around an existing electrical cable. Through careful planning and clear communication with the client, together we implemented a minimally invasive strategy that enabled efficient execution of the works.
Installation Overview
The scope of works:
The project involved full site preparation, including delivery logistics and welfare provisions for the installation team. RA Dalton installed a Klargester BioAir 2 packaged sewage treatment plant, securely housed within a reinforced concrete surround. Ancillary works included the installation of inspection chambers and connection of new inlet and outlet pipework.
A new drainage field was created using slotted pipework and clean gravel, protected by a geotextile membrane to ensure long-term performance. Electrical connections were completed in accordance with certification requirements, with final commissioning of the system carried out on site.
The existing septic tank was emptied and professionally decommissioned, then backfilled and reinstated. All surplus excavated material was removed and disposed of responsibly.
Certification and Client Feedback
All works were carried out in accordance with current building regulations and environmental standards.
The client expressed outstanding satisfaction with the professionalism, efficiency, and quality of the installation.
“What a refreshing experience dealing with such a professional company in this day and age. We purchased an old rural property and reached out to RA Dalton to do a survey on a very old and dysfunctional septic tank prior to the sale. We met Ian Murray who was very professional and helpful to the extent that after the sale we then instructed RA Dalton to install a new water treatment plant. They never tried to rip us off or over charge but went out of their way to find the best and most cost-effective solution. The installation team led by Stephen Dalton were just as professional, helpful and experienced and the whole process from start to finish was outstanding service wise. Great guys and great service and great product!!! Can’t recommend them highly enough!!”