RA Dalton Success Stories

RA Dalton Ltd are the Klargester number one accredited installer covering the whole of the UK.

Contact Us Today

One year on – Celebrating Wastewater compliance

If you have followed our blogs previously you may remember this installation where we installed a new Klargester Bioficient 1 to replace a non-compliant septic tank – see more here. The new package sewage treatment plant has now been installed a year and in March 2024 it was time for the system’s first service!

In order to keep in line with the Klargester extended warranty the system had been installed and commissioned by a Klargester accredited installer (ourselves) and in order to keep this going it was essential that the routine maintenance and emptying was continued in line with the manufacturer’s recommendations.

Photos from the before the installation

The Klargester Bioficient 1

This Klargester Bioficient 1 is a 6-population equivalent sewage treatment plant designed to suit up to a 4-bedroom property or a small commercial operation. The system is designed and certified in line with BS EN12566-3 to allow for a discharge to the nearby watercourse without the requirement for an Environment Agency permit (excluding SSSI, GPZ etc) therefore it is vital to ensure that the system is appropriately serviced so the effluent quality is controlled and not causing pollution.

These smaller systems require a full electrical and mechanical service every 12 months to ensure the system is operating efficiently, this also helps identify any potential issues that may occur and any parts that may need replacing.

Photos from the installation

Klargester service

During the service of your sewage treatment plant a number of items are checked to ensure functionality, on the smaller domestic aeration sewage treatment plants these include but are not limited to:

  • Condition and suitability of the blower housing.
  • Overall condition of the blower
  • Air Solenoid/ timers
  • Loss of pressure alarms
  • Control Panel
  • Air Filters
  • Alarm Beacon
  • Air lift/ sludge return pump.
  • Colouration of the effluent
  • Condition of the covers
  • Airline and airlift conditions
  • Airlift valves.
  • Media condition
  • Diffuser pipework
  • Bacteria Growth
  • Ventilation
  • Electric Connections
  • Holding chamber condition

During this service we are also able to replace the systems’ consumable parts when necessary, during this service our experienced servicing engineer replaced the filter and diaphragms which are not only necessary as part of good standard procedure but also a requirement to conform to the blower’s individual manufacturers warranty.

As a wastewater proprietor it is your responsibility to ensure that you keep an accurate record of all maintenance and emptying carried out on your sewage treatment plant, this may be required if you ever need to prove compliance with the 2020 General Binding Rules.

Photos from the service

Supporting the next stage of our growth

RA Dalton servicing van in a field

As RA Dalton continues to grow, we’re looking at how we can develop the way we work to support both our customers and the wider business.  

With new opportunities emerging and our customer base continuing to develop, it is vital our internal processes and communication evolve alongside us. This means strengthening how different departments connect and ensuring that we continue to provide the consistent, quality, personable service our customers expect.  

As part of this ongoing development, we are pleased to share that Gail Bould will be moving into a broader role within the company as Business Development Operations Manager. 
Gail Bould standing in front of the RA Dalton Logo
“I would like to express how proud I am to be given the opportunity, and I am looking forward to working closely with all departments in achieving our ambitions for growth across the organisation. Whilst ensuring the highest standards of customer engagement and satisfaction.”

Looking Ahead

As we look towards the future, it’s an exciting time for RA Dalton. Growth isn’t simply about bringing in new business; it is also about building on what we already do well and finding ways to work better together.
Congratulations on your new role Gail, we wish you every success as you take on this next chapter!
Gail sitting at her desk

Durham Office

01388 537030

Burtreeford
Bishop Auckland
County Durham
DL13 1DB

Crook Office

01388 537030

Unit 10c,
Beechburn Industrial Estate,
Crook,
County Durham, DL15 8RA

Glasgow Office

01698 827628

Room 1.6,
CoVault,
1 Redwood Crescent
East Kilbride
G74 5PA

Chesterfield Office

01246 865412

Unit 2, Midway Business Centre
Bridge Street Industrial Estate
Clay Cross, Chesterfield
S45 9NU

Cornwall Office

01326 653222

PFS Ltd, Suite 9,
The Camborne Business Centre,
Weeth Lane, Camborne,
TR14 7DB

West Yorkshire Office

Unit 1D
Canteen Mill Industrial Estate
Burnley Road
Todmorden
OL14 7DR

We cover the following areas