The Glorious Klargester BioTec 1 and glowing reviews.

In the latter part of 2019 our contracts manager Ian Murray attended a property in Northumberland to inspect a property’s sewage setup to gain clarification on compliance with reference to the 2020 General Binding Rules.

The 3 bedroom property was served by an old brick built Septic tank and trickling filter with a direct discharge to a watercourse which would have been compliant when the tank was installed. To ensure the effluent was still being treated we took a sample to test for Biochemical Oxygen Demand, Suspended solids, Ammonia.

Unfortunately the lab results were received indicating that the BOD and Suspended Solid counts were not at an appropriate level and as such the property was not compliant with the 2020 General Binding Rules.

General Binding Rules 2020.

To comply with the new legislation it was determined that the best course of action was to install a new sewage treatment plant in the property boundary retaining the discharge to the watercourse this was instead of gaining permissions to install a new drainage field in the neighbours’ land this would allow for all services to be retained within the property.

The system we proposed to install was a Klargester BioTec 1 package sewage treatment plant, the plant was to be located to the right hand side of the existing tank allowing us to utilise and modify the existing drainage. It was identified during the visits to site that there were a number of surface water connections that would need to be separated during the install.

The Klargester BioTec 1.

On any installation we take pride in our workmanship and take great care and attention when reinstating the working area, all works we carry out are to a machine finish and we try to limit the visual impact of our works.

Large machinery can often leave its mark and is an unfortunate necessary evil when it comes to have your new treatment plant installed and whilst some companies may get your system installed within a day or 2 – there is a reason why we take a bit longer!

Giving our customers confidence with a positive experience!

Our main aim here at R A Dalton is having happy customers and needless to say we think this customer was happy with the results of her install!

“To all concerned at R A Dalton, I would like to thank all the team from start to finish, during initial enquiries, survey and testing and installation of new Sewage Treatment Plant.

The installation which quite frankly I was dreading was choreographed by Lewis and his co-workers with enthusiasm, professionalism and a measure of good humour.

Great care was taken to ensure my garden was left in as good a condition as possible, considering the size of the equipment required.

I would highly recommend R A Dalton to anyone requiring a Sewage Treatment Plant.”

More RA Dalton Waste Water News

Durham Office

01388 537030

Burtreeford
Bishop Auckland
County Durham
DL13 1DB

Crook Office

01388 537030

Unit 10c,
Beechburn Industrial Estate,
Crook,
County Durham, DL15 8RA

Glasgow Office

01698 827628

Office 60
East Kilbride Business Centre
14 Stroud Rd
East Kilbride
G75 0YA

Chesterfield Office

01246 865412

Unit 2, Midway Business Centre
Bridge Street Industrial Estate
Clay Cross, Chesterfield
S45 9NU

We cover the following areas