Efficient Wastewater Solution for Growing Business: BG BioDisc 1100mm invert and DPSAL2 Twin Effluent Pump Station

The Challenge: An Overloaded System

At a recent site on Northallerton, expansion brought an unforeseen challenge—the existing Klargester BC BioDisc wastewater treatment system was no longer sufficient. As the number of staff, visitors, and café patrons grew, the system struggled to keep up, leading to frequent flooding and occasional backups in the outfall pipe. The decision was reached to introduce a pumped outlet to remove this issue and provide a sustainable long term solution.

The Solution: Upgrading with a Klargester BG BioDisc

Our installations team took on the task of designing and upgrading the system. After a detailed assessment, the appointed contracts manager proposed the installation of a larger Klargester BG BioDisc, positioned alongside the redundant tank. This would work in tandem with a new final effluent pumping station, ensuring that wastewater could be managed effectively without overloading the existing outfall chamber.

Project Planning and Preparations

The project required careful planning. To allow machinery access, a section of fencing had to be removed, and once work was complete, it would be reinstated. With regulatory compliance in mind, rainwater outlets were inspected to ensure they were separate from the foul drainage system. Power supply modifications were also necessary by adapting the existing connection.

Installation Process

Once the groundwork was prepared, the installation commenced. The Klargester BG BioDisc was carefully set in a full concrete surround, with two inlet inspection chambers and new pipework laid to integrate from the existing system. The DPSAL2 Twin Pump Effluent Chamber was then installed, ensuring that final effluent could be efficiently discharged without risk of backups. With precise coordination, the new system was connected to the existing infrastructure, while outdated components of the old system were safely decommissioned.

Challenges were anticipated and managed. The excavation process revealed conditions that required contingency planning—hard rock demanded specialist equipment. These possibilities were accounted for in advance, ensuring that work proceeded smoothly with minimal delays.

Completion and Final Commissioning

As the final stages of installation wrapped up, attention turned to restoring the site. The old tank was emptied and filled with gravel before being covered with excavated soil. Any surplus soil was removed via grab wagons. The system was then powered up, tested, and commissioned, ready to handle the demands of our clients growing operations.

A Future-Ready Solution

The result was a wastewater treatment solution built for the future. With the new BioDisc and effluent pump station in place, the facility could operate efficiently without fear of overloading the drainage system. Through careful planning and expert execution, our engineers delivered a seamless upgrade that met regulatory standards and ensured long-term reliability for the client.

For more information on wastewater treatment solutions, contact us today.

Supporting the next stage of our growth

RA Dalton servicing van in a field

As RA Dalton continues to grow, we’re looking at how we can develop the way we work to support both our customers and the wider business.  

With new opportunities emerging and our customer base continuing to develop, it is vital our internal processes and communication evolve alongside us. This means strengthening how different departments connect and ensuring that we continue to provide the consistent, quality, personable service our customers expect.  

As part of this ongoing development, we are pleased to share that Gail Bould will be moving into a broader role within the company as Business Development Operations Manager. 
Gail Bould standing in front of the RA Dalton Logo
“I would like to express how proud I am to be given the opportunity, and I am looking forward to working closely with all departments in achieving our ambitions for growth across the organisation. Whilst ensuring the highest standards of customer engagement and satisfaction.”

Looking Ahead

As we look towards the future, it’s an exciting time for RA Dalton. Growth isn’t simply about bringing in new business; it is also about building on what we already do well and finding ways to work better together.
Congratulations on your new role Gail, we wish you every success as you take on this next chapter!
Gail sitting at her desk

Durham Office

01388 537030

Burtreeford
Bishop Auckland
County Durham
DL13 1DB

Crook Office

01388 537030

Unit 10c,
Beechburn Industrial Estate,
Crook,
County Durham, DL15 8RA

Glasgow Office

01698 827628

Room 1.6,
CoVault,
1 Redwood Crescent
East Kilbride
G74 5PA

Chesterfield Office

01246 865412

Unit 2, Midway Business Centre
Bridge Street Industrial Estate
Clay Cross, Chesterfield
S45 9NU

Cornwall Office

01326 653222

PFS Ltd, Suite 9,
The Camborne Business Centre,
Weeth Lane, Camborne,
TR14 7DB

West Yorkshire Office

Unit 1D
Canteen Mill Industrial Estate
Burnley Road
Todmorden
OL14 7DR

We cover the following areas